The door installation in Kysucke Nove Mesto 17 September 2019 Share: In the 35th week in the year of 2019 we delivered and installed fire doors with fire resistance EW 30 D3 in Kysucke Nove mesto and the subsequent engineering of the building during the final inspection. Prev Next